Tuesday, 24 June 2014

Schedule and Production Log

18/11/13
First I started to make my production log witch i would up dated every week i had don/finished something. After doing this i went in to my research. Then went on to start my ideas generation.

25/11/13    
Week two i have finished my ideas map and i am moving on to my story board. The story board to going to be of a man walking an e6 dog who will then get knocked over.

02/12/13 
This week i started to make my 3d animation animation of the e6 dog running over his owner to do this i had to go into molder and separate the e6 from the square background it had. Finished Ethical/H&S Sign-off

09/12/13
I started the animating process of my work but trying to get the man to walk in time with the e6 dog was proving difficult but i tried to carry on with it.

16/12/13
The e6 dog and his owner changed and that made it so he didn't have an owner and i was just he dog knocking over a camera as it was taking to long and it was difficult to do. After finishing this i was ready to put it up on to youtube and then on to my blog. i then went on to finishing my production and post production. 